2023 - London UK

Royal Hospital for Neuro-disability Wellesley Ward

Floyd Slaski have recently designed and delivered the Wellesley Ward, which is part of clinical group Specialist Services (SS) and currently has mixed sex patients with different levels of challenging behaviour.

Patients are accommodated in 13 single bedrooms located in two wings with communal sanitary facilities and 2 day rooms, with no direct outdoor access.

The project involves the refurbishment of the ward with remodelling of the ancillary spaces within the project demise including the addition of a sensory/quiet room.

Residents typically stay 3 to 6 months minimum and for some it is a permanent home. The new refurbishment design is aiming to give a homely, well-being, non-clinical feel.

Contract Value

£2 Million

Roles

Architect & Lead Designer

Client

Previous
Previous

Harefield Hospital Private Patient Ward

Next
Next

Welbeck Street Office Accommodation